News

Part 4 of work on Kijkduin-Houtrust route begins

Published: 29 June 2018Modified: 29 June 2018

The municipality will begin working on Part 4 of the Kijkduin-Houtrust route roadworks as of Monday, 2 July at 6.00 hrs. The Segbroeklaan will then be closed from the Houtrustweg up to the intersection with the Sportlaan. During this period the sewer pipes will be replaced and the road will get a new design.

This will mean the following for road users:

  • The Sportlaan will temporarily become a 2-way street.
  • The intersections will remain open between the Segbroeklaan and the Fahrenheitstraat and Goudenregenstraat .
  • The Zonnebloemstraat will become a 1-way street from the Hyacinthweg in the direction of the Daal en Bergselaan.
  • The Ranonkelstraat-Goudsbloemlaan intersection will be closed. It will not be possible to turn right onto the Segbroeklaan from the Van Boetzelaerlaan.
  • Public transportation will operate along its regular route.

    Make sure you are well-prepared and follow the diversion routes.

    Also see: www.kijkduin-houtrust.nl