The municipality is working on the Kijkduin-Houtrust route as of 26 March. The work will cause traffic disruptions. In order to limit the inconvenience as much as possible, the project has been divided into 6 parts. The road will be ready for use at the end of April 2019. Take a look at the planning.

The roadworks will cause traffic disruptions. Follow the diversion routes indicated on the electronic road signs. The fastest route will be displayed.
  • Part 1 | 26 March to 6 May 2018

    The road will be closed from the corner of the Machiel Vrijenhoeklaan/ Kijkduinsestraat to the petrol station. Buses 23 and 24 will be temporarily diverted.

  • Part 2 | 7 May to 20 June 2018

    The road will be closed from the petrol station on the Machiel Vrijenhoeklaan to the De Savornin Lohmanlaan. Buses 23 and 24 will be temporarily diverted.

  • Part 3 | 26 March to 5 July 2018

    The Daal en Bergselaan intersection will be open again to traffic. Work will continue during the construction of the new roundabout at the intersection between the Sportlaan and Daal en Bergselaan. This will not cause any delays or extra traffic disruptions.

  • Part 4 | 2 July to 9 September 2018

    The Segbroeklaan will be closed from the Houtrustweg to the intersection with the Sportlaan. The intersections with the Fahrenheitstraat and the Goudenregenstraat will remain open. The entire Sportlaan will be open in 2 directions. The Zonnebloemstraat will become a 1-way street from the Hyacinthweg in the direction of the Daal en Bergselaan. The Ranonkelstraat-Goudsbloemlaan intersection will be closed. From the Boetzelaerlaan it will not be possible to make a right onto the Segbroeklaan. Public transportation will operate its regular route.

  • Part 5 | 10 September to 20 January 2019

    The Segbroeklaan and the Sportlaan will be closed from the Goudenregenstraat to the intersection with the De Savornin Lohmanlaan. The Laan van Poot will become a 2-way street. The Zonnebloemstraat from the Hyacinthweg will remain a 1-way street in the direction of the Daal en Bergselaan. The diversion routes will use the De Savornin Lohmanlaan and the Laan van Meerdervoort. The intersection with the Daal en Bergselaan will remain open to pedestrians and cyclists. Bus 24 will operate a somewhat different route.

  • Part 6 | 21 January 2019 to 26 April 2019

    The Segbroeklaan and the Sportlaan will be closed from the Goudenregenstraat to the Muurbloemweg. The Zonnebloemstraat from the Hyacinthweg will remain a 1-way street in the direction of the Daal en Bergselaan. A traffic barrier will be placed on the Zandzeggelaan to prevent cut-through traffic. The intersections with the De Savornin Lohmanlaan and the Sportlaan will remain accessible to pedestrians and cyclists.

Kijkduin-Houtrust roadworks app

Download the Kijkduin-Houtrust app with traffic delays. You will receive a push alert if there are unforeseen closures. This way you are always well-prepared for your journey.

Frequently asked questions about the Kijkduin-Houtrust route roadworks

Here you find answers to the most frequently asked questions. Are you missing information? Send a message to the municipality using the contact form.

Diversions for Kijkduin-Houtrust route roadworks

During the Kijkduin-Houtrust route roadworks, traffic will be diverted. Bus 23 and 24 will operate a different route during part of the project. Use the electronic road signs for the fastest route.

Be prepared before starting your journey. Follow the diversion routes on the electronic signs. This is the fastest route. The extra travel time can increase up to half an hour. So use your bicycle as much as you can and try to avoid rush hour traffic.