skip_navigation_text skip_navigation_text
  • NL Nederlands
  • lees voor
  • rss
Project

Accessibility of Scheveningen Boulevard

By car, public transport or bicycle to Scheveningen

Gepubliceerd: 17 augustus 2010 Laatste wijziging: 08 mei 2012

While many people visit the Scheveningen beach and the pavilions, work is being performed on a beautiful new boulevard a little further on. During the work, Scheveningen remains easily accessible by car, public transport and by bicycle.

The work area will have a length of approximately 500 meter until October 2012. To keep the work area, the boulevard and the pavilions easily accessible, a temporary boulevard has been constructed around the work area (between the loop of tram 11 and Vissershavenweg). The new pedestrian bridge at Seinpostduin connects Scheveningen-Dorp with the beach.

By car, motorcycle/bicycle or public transport to Scheveningen

Due to work on the boulevard, the traffic and parking situation has been somewhat changed in 2012. You will therefore need to prepare yourself very well and find out how you can best access Scheveningen with public transport, motorcycle/bicycle or by car.

Also see

PDF bestandMap to Scheveningen  (PDF, 527 kB)

PDF bestandDetailed map Scheveningen boulevard  (PDF, 347 kB)